Feeds:
Posts
Comments

NRC Night at the Dome

Never been built

General Electric's ESBWR: Not ready for prime time

Turnout was high at the NRC’s public meeting in Victoria on Thursday about the future of nuclear power in the area. Tara Bozick of the Victoria Advocate estimated 400 people showed up. There was so much going on it might warrant a second post.

The NRC attempted to quell concerns about the fact that Exelon plans to build the Economic Simplified Boiling Water Reactor (ESBWR), despite the fact that they have not yet certified it. In fact, the application for design certification was filed in 2005. Who knows when or if it will be certified, but Exelon’s application to build two of them in Victoria County puts added pressure on the NRC to approve the design.

It was publicly stated by the NRC last night that the ESBWR has never been built before. Why they would consider a combined operating license (COL) at the same time as they are reviewing revisions to the reactor design application is perplexing to say the least. So much for a streamlined process.

Matt